Datacenter power & shells
The electricity, grid connections, cooling and buildings AI datacenters need — increasingly the binding constraint on compute.
Power is the bottleneck; the shift to on-site generation accelerates.
neutral · fairly confident · unchanged since 18 Jun 2026